Complete House Building
Building a house from drawings to handover — one team for structure, finishing and everything in between.
Building a house in the Kathmandu Valley, start to finish
Building a house from drawings to handover — one team for structure, finishing and everything in between.
- Drawings, approval support and estimation
- Foundation, structure and slab work
- Doors, windows, roofing and finishing
- Single point of contact until handover

Building a house is usually the largest single thing a family in the Kathmandu Valley ever pays for, and the part that goes wrong most often is not the concrete — it is coordination. A separate mason, a separate electrician, a separate carpenter and nobody holding the schedule. We build houses as one contract: drawings and approval support, foundation and RCC structure, blockwork, roofing, wiring and plumbing, plaster, windows, doors, and interior finishing, handed over as a finished home.
What is included
A complete house contract with us covers structural drawings and municipal approval support, site clearing and layout, foundation and footing, RCC columns, beams and slabs, brick or block walls, roof, internal and external plaster, electrical and plumbing rough-in and fitting, flooring, windows and doors, painting, and final cleaning before handover. Where you want modular kitchen, wardrobes or a designed TV wall, that is folded into the same programme instead of being a separate job months later.
Earthquake-conscious structure
Nepal sits on an active seismic belt and the 2015 earthquake changed how the valley builds. Structural work follows the approved drawings and the Nepal Building Code — correct steel detailing at column-beam junctions, proper lap lengths, stirrup spacing at the ends of members where it matters most, and concrete mixed and cured rather than rushed. We would rather lose a week to curing than hand over a house we would not live in ourselves.
How long it takes and what it costs
A straightforward two-to-three storey house in the valley typically runs eight to fourteen months from foundation to handover, depending on size, finish level and how quickly approvals and material decisions are made. Cost is driven mostly by finishing, not structure — the structure is fairly predictable, while flooring, kitchen, windows and sanitary ware can swing the total considerably. We give an itemised quotation before work starts so you can see which line items you can adjust, rather than a single lump figure.
Where we work
We work across Kathmandu, Bhaktapur and Lalitpur, and our own workshop and office are in Madhyapur Thimi-1, Lokanthali, Bhaktapur — so most sites in the valley are a short drive away and our team can be on site the same week.
Related services
Frequently asked questions
Do you handle municipal drawing approval?
We prepare the structural and architectural drawings and support you through the municipal approval process in Kathmandu, Bhaktapur and Lalitpur. The application is filed in the landowner's name, so you remain the applicant, but we prepare the drawings, respond to queries and coordinate with the consultant so you are not chasing it yourself.
Can you build on a small or irregular plot?
Yes. Most plots in Lokanthali, Thimi and the older parts of the valley are narrow or irregular, and setback rules limit what can be built. We plan the layout around the plot shape and the setback requirement rather than forcing a standard design onto it, which usually recovers more usable floor area than people expect.
Do I pay everything upfront?
No. Payment is staged against completed work — typically at foundation, at each slab, at blockwork and plaster, at finishing, and a final portion at handover. You pay for a stage after it is done and you have seen it, not before.
Can I make changes once building has started?
Small finishing changes — tile choice, paint colour, socket positions — are normally fine and we expect them. Structural changes after the slab is cast are expensive and sometimes not possible, so we go through the layout carefully with you before the foundation is poured.
When should you choose this service?
Building on Your Own Land
A new house planned around your family, budget and the shape of your plot.
Replacing an Old House
Taking down an unsafe old house and rebuilding properly in its place.
Half-Finished Construction
Completing a house that another contractor left unfinished.
Planning to renovate your home?
Send us your basic details. Our team will guide you with the right service, measurement plan and next step.
